Project Rescue & Stabilization

We adopt half-finished software someone else walked away from, and prototypes that have outgrown the tool they were built with, work out what was actually promised, and deliver it properly.

Rescue starts where another engagement ended badly: a half-finished product, thin documentation, and a deadline that has already slipped.

A takeover is a different job from a new build. Most of the work in the first weeks goes into establishing what actually exists, what was actually promised, and which of those two the remaining budget can still reach.

Two ways people arrive

The first is the stalled project. A developer or an agency delivered part of it and then went quiet, the documentation is thin, and the people waiting for the product are already asking questions. The second is newer. A working prototype was built with an AI tool such as Lovable, Bolt, Replit or Cursor, often by the founder, and it now has to take payments, keep customer data safe and hold up under real use.

The method is the same in both cases. We read what exists, test what it actually does, and tell you in writing whether finishing it or rebuilding the core is the better use of the budget. For an AI-built prototype, that starts with a fixed-price audit.

How it runs

Read everything first. Map what exists against what was promised. Stabilize the riskiest behavior with automated tests, then finish the remaining scope in documented milestones.

Reading everything means the source code, the repository history, the deployment setup, whatever specification exists, and the threads where scope was agreed along the way. On a stalled project the commit history is usually the most honest record you have, because it shows what was genuinely worked on and the point at which the work stopped.

The first two weeks

The opening phase produces three things: an inventory separating what runs from what only appears to run, a written list of the gaps between the promise and the product, and an estimate for finishing that you can hold us to. If the honest conclusion is that finishing costs more than starting again, we say so in writing, even though that is the smaller engagement.

WHAT WE ASK FOR ON DAY ONE
✓Access to the source code, in an account you own rather than a handover archive
✓The hosting, database, and domain accounts, however they were originally set up
✓Whatever was signed: the proposal, the specification, and any change requests
✓The last working build, if one exists, and the way it was deployed
✓Any credentials or third-party accounts the previous developer held on your behalf

What it looked like on EvitaAmenda

EvitaAmenda, a transport-compliance platform for light commercial fleets, reached us partially implemented, unstable and without reliable documentation, with its production deadline already passed. The requirements were recovered from correspondence and from the product itself. The first weeks went into an audit that mapped what existed against what had been promised, then into automated tests around the riskiest paths: driver-state logic, time counters and alerting. The promised scope was finished in documented milestones, and the system went live through a staged rollout, with monitoring in place before anyone was asked to rely on it. It is in daily operational use by client companies, and we continue to develop it.

What changes

Within the first weeks you have written requirements, a tested core, and a plan you can verify progress against. The difference between a rescue and a slow failure is exactly that paperwork.

What is in scope, and what is not

A rescue covers finishing the agreed product, making it safe to run in production, and handing it over in a state you own outright. It does not quietly widen into a redesign. New ideas are welcome, and they are quoted separately, so the finish line stays where it was on the day we started.

Questions we get asked

What do you need from me to start?

Access rather than archives: the code in an account you own, the hosting, database and domain accounts, whatever was signed, and the last working build. The day-one list above is the whole of it. If some of it is missing, say so. Recovering access is often part of the first week.

Can you work alongside the previous developer?

Yes, where they are still reachable and willing. A short handover conversation saves days of reading. Where they are not, the repository history and the deployment setup tell most of the story, and the plan allows for that.

How is the assessment scoped?

As a fixed-scope piece of work with its own written outcome: the inventory, the gap list and the estimate for finishing. The document is yours to take to anyone. If finishing costs more than starting again, it says so.

Further reading

If a project of yours has stalled, bring whatever exists. The first conversation is a diagnosis, and it costs nothing.