CASE STUDY — DELIVERED IN THREE QUARTERS OF THE PLANNED TIME

GPS'CU by RS

A GPS fleet tracking platform taken from a signed specification to a live product in 26 days: Teltonika tracker ingest, live map, trip history, reports, RO e-Transport and a public API, running the client's fleet nine days before the agreed hand-over date.

INDUSTRY
Transport & logistics
ENGAGEMENT
Specification → Delivery
STATUS
In production

01 — The brief

RS Smart Tech Solutions knows transport from the inside. It installs Teltonika trackers, operates a fleet of its own, and is the company behind EvitaAmenda, the driver-hours compliance platform we took over and brought to production earlier in 2026. EvitaAmenda runs on GPS data, and that data came from third-party tracking providers: a different account, data format and support line for every fleet.

RS's own fleet ran on a third-party tracking platform too. Instead of renting someone else's platform, RS decided to own it, for its own fleet and as a SaaS product: GPS tracking and fleet management under RS's brand, on the Teltonika hardware RS installs, with RO e-Transport reporting to ANAF built in and a live data feed into EvitaAmenda for clients who use both. The contract was signed on 6 October 2026, and the hand-over date agreed with RS was 10 November.

02 — What we started with

A requirements document specified with RS in August: every technical decision answered before the first line of code
Teltonika FMC920 and FMC150 trackers, speaking Codec 8 Extended over TCP
ANAF's published RO e-Transport GPS specification, with penalties in force since January 2026
A production system, EvitaAmenda, that had to receive the new data without being changed
Five weeks to the agreed hand-over, and a real fleet waiting to move onto the platform

03 — Scope of responsibility

Teltonika TCP ingest, Codec 8 and 8 ExtendedLive map and fleet managementTrips, stops and route playbackGeofences and alertsTrack & Trace sharing linksEight reports: PDF, Excel, scheduledRO e-Transport over ANAF's GPS APIPublic REST API with OpenAPI docsGPS feed into EvitaAmendaSelf-registration, orders and device stockOperator panel and tracker diagnosticsProduction infrastructure, CI/CD, backups

04 — How the delivery ran

Specify

The requirements document was completed with RS before the contract: data model, protocols, acceptance criteria and the open decisions, each with a default. Nothing load-bearing was left to be discovered mid-build.

Plan

A four-week schedule with dated milestones and the critical path written down. Every architecture decision was recorded as it was made, so RS could see what would land when, and why.

Build in parallel

Independent work lanes, each with its own branch and tests, merged daily behind a pipeline that built, tested and scanned every change. A walking skeleton ran end to end in the first week of the build, and the platform grew around it.

Launch and hand over

Production live on 26 October. The client's own fleet running on the platform on 1 November. Acceptance packs per milestone, operations runbooks, and every account and credential in RS's name.

05 — The product

The GPS'CU live map: the vehicle list with status filters beside the map, each vehicle marked as moving or parked
LIVE MAP AND FLEET STATUS
Declaring a RO e-Transport UIT code in GPS'CU: the 16-character code, the vehicle and the declared registration number
RO E-TRANSPORT: DECLARING A UIT CODE
TESTING
Three layers from the first week: unit tests on the Teltonika codec and the domain rules, integration tests against a real PostgreSQL and a real TCP socket, and end-to-end tests that drive the portal with a simulated tracker. Dependency, container image and web security scans run in the same pipeline, on every change.
PRODUCTION
Images built once and deployed by digest, migrations first, a smoke check deciding the result and a rollback to the previous release if it fails. A managed PostgreSQL with point-in-time recovery, encrypted storage for the ANAF certificates, and every resource in RS's own DigitalOcean account from day one.

06 — Where it stands

In production since 26 October 2026; the client's own fleet live on it since 1 November, nine days before the agreed hand-over date
Teltonika data from that fleet now feeds EvitaAmenda in production, through the provider API built for it
RO e-Transport built to ANAF's specification and verified against a test double; the live connection waits for the certificate ANAF issues
Public API documented and available to integrators; development continues with RS's change requests
The second product we have built with RS, after EvitaAmenda. A third is already in discussion, and we remain RS's technical partner.